renew
Including Penalty Fees with your Renewal

If your renewal fee is not paid before the expiration date, you become delinquent and a flat penalty fee must be added to your total renewal fee equal to 1/6 of the fee (see ARS 32-127(B)). If you are delinquent, you may not perform the duties of your discipline within the Board’s jurisdiction until you renew. There are no partial penalty fees. The penalty fee is the same if the renewal fee is a day late or 365 days late. Disciplines where delinquency may carry over one or two years will incur additional penalty fees per year (see example below for clarification). You will remain delinquent until you renew and pay the required fees. If you remain delinquent beyond your discipline’s renewal period, your registration will be canceled and you must apply as a new registrant.

 
Profession / Occupation No Late Fee Late, but less than a year more than a year, less than two more than two
Home Inspector (Annual) $75.00 $87.50 NA NA
Alarm Agent / Controlling Person (Triennial) $195.00 $227.50 $260.00 $292.50
Architect, Engineer, Geologist, Landscape Architect, Land Surveyor (Triennial) $225.00 $262.50 $300.00 $337.50

Example:

You are an Engineer. Your registration expires September 30, 2024 (three-year registration period). The last day you may renew your registration before it is canceled is September 30, 2027 (three-year registration period = three-year delinquency period before cancellation). Your Renewal Fee is $225.

Not late fee window. If the Board receives your renewal fee or it's post stamped on or before September 30, 2024 there is no penalty fee.

Total owed = $225.00

One-year late fee window. If the Board receives your renewal fee between October 1, 2024 and September 30, 2025 there is a $37.50 penalty fee (one sixth of $225).

Total owed = $262.50

Two-year late fee window. If the Board receives your renewal fee between October 1, 2025 and September 30, 2026 there is an additional $37.50 penalty fee ($75 in total penalty fees).

Total owed = $300.00

Three-year late fee window. If the Board receives your renewal fee between October 1, 2026 and September 30, 2027 there is an additional $37.50 penalty fee ($112.50 total).

Total owed = $337.50

Beyond Three-year late fee window. If the Board doesn’t receive your renewal fee by September 30, 2027 your registration will be cancelled and you will need to reapply as a new registrant.